Renovering a House in Ballerup: Why One Contractor for Everything Saves Time and Money

Hiring one contractor for a full house renovering in Ballerup saves time because all trades follow one shared schedule, with no gaps between jobs. It saves money through a fixed price quote, fewer mistakes between trades and a faster finish, so you spend less on temporary housing, storage and repairs.
Many homes in Ballerup are older villas and terraced houses that need several things fixed at once: new floors, updated wiring, plumbing repairs and fresh walls. Managing each job separately means coordinating plumbers, electricians, carpenters, painters and floor layers yourself. One delay affects everyone else, and the result is often wasted time, extra costs and frustration.
A simpler approach is to let one contractor manage the entire renovation. Choosing totalentreprise ballerup gives homeowners a single point of contact and a coordinated plan, from the first inspection to the final handover.
What is turnkey contracting (totalentreprise)?
Turnkey contracting means one contractor takes full responsibility for a renovation project, from planning to handover. In Denmark, this is called totalentreprise.
Instead of hiring and managing individual tradespeople yourself, the main contractor plans the work, coordinates the trades and makes sure each stage is completed in the right order.
For homeowners, the main advantage is simplicity: one contact person, one agreement and one timeline. If you have a question about plumbing, electrical work or flooring, you call the same person every time.
What are the hidden costs of managing trades yourself?
Managing trades yourself costs more than the sum of the individual job prices, because of gaps, mistakes and your own time.
Gaps between trades: An electrician might finish on Monday, but the carpenter may not be free until the following week. Meanwhile, parts of your home stay unfinished and unusable.
Mistakes between jobs: A plumber might install pipes that clash with planned kitchen cabinets. When one trade damages another’s work, it is often unclear who should pay for the repair, which can lead to disagreements.
Your own time: Arranging meetings, answering calls and checking progress can take several hours every week, which is hard to manage alongside a full time job or a family.
Delays that add up: A missed appointment or a late delivery pushes the next stage back. A project planned for a few weeks can stretch into months.
Managing Trades Yourself vs One Contractor
| Managing trades yourself | One contractor | |
| Contact points | Several | One |
| Scheduling | You coordinate | Contractor coordinates |
| Gaps between jobs | Common | Minimal |
| Responsibility for mistakes | Unclear | One party |
| Budget | Several separate prices | One fixed quote |
How does one contractor save time on a renovation?
One contractor saves time by running all trades on one shared schedule, so each stage starts as soon as the previous one is finished.
Electricians and plumbers complete their work before walls are closed. Carpenters prepare the rooms before flooring begins. Materials are ordered ahead, so the project does not stop halfway because a floor material or fitting is out of stock.
Problems are also solved faster. Older homes often reveal hidden issues once walls or floors are opened, such as damaged pipes, uneven surfaces or outdated wiring. With one contractor in charge, these are handled within the overall plan instead of the homeowner having to find and coordinate a new tradesperson.
How does one contractor save money?
One contractor saves money through a clear fixed price, fewer coordination mistakes and a shorter project.
- A fixed price quote: When the scope and conditions are clearly defined before work begins, the household budget is easier to plan.
- Fewer repairs between trades: With one party overseeing every stage, there is less risk of one trade having to redo or repair another’s work.
- Combined material purchasing: Ordering materials for the whole project together reduces separate delivery costs.
- Lower indirect costs: A faster finish means less time living around construction and less money spent on temporary accommodation or storage.
These savings are not always visible in the first budget, but they make a real difference to the total cost.
When should new floors be laid during a renovation?
New floors should be laid near the end of a renovation, after plumbing, electrical and wall work are finished, so they are not damaged by tools, equipment, paint or building materials.
Before installation, the subfloor needs careful preparation:
- Stability and cleanliness: the subfloor must be solid and suitable for the chosen material.
- Levelling: uneven surfaces need to be levelled first.
- Moisture: moisture levels should be checked, especially in older homes and wet rooms, and a moisture barrier added where needed.
- Finishing details: door thresholds must match the new floor height, and skirting boards give a neat edge.
Common flooring choices for homes in Ballerup include:
- Wood flooring: a natural look for living rooms and bedrooms.
- Laminate flooring: practical and available in many designs.
- Vinyl flooring: easy to maintain and durable for everyday use.
- Tiles: popular in bathrooms, entrances and kitchens.

Professional gulvlægning makes sure the floor is installed correctly and fits the rest of the renovation. When flooring is part of the overall plan, measurements, preparation and installation are easy to coordinate with the other trades.
What order should a house renovation follow?
Most larger renovations follow the same basic order, so that each trade can work without damaging finished jobs:
- Inspection and planning: the property is inspected and the project scope is agreed.
- Demolition and removal: old flooring, damaged materials and unwanted fittings are removed.
- Plumbing and electrical work: pipes, wiring and sockets are installed before walls and ceilings are closed.
- Walls, plastering and ceilings: surfaces are repaired and prepared for finishing.
- Floor laying: subfloors are checked and prepared, then the new flooring is installed.
- Painting and finishing: walls, ceilings and woodwork receive their final treatment.
- Final check and handover: the work is inspected, remaining details are fixed and the home is handed back.
Is turnkey contracting right for your home?
Turnkey contracting is the best fit when several rooms or parts of a home need renovating at the same time.
It works especially well for:
- Older villas and terraced houses that need new wiring, plumbing, wall repairs and flooring together.
- Busy families who want one person handling appointments and follow up.
- New homeowners who want to renovate before moving in, to avoid repeated disruption later.
For one small repair or a single simple job, a full turnkey arrangement is usually not necessary.
Frequently Asked Questions
How long does a full house renovation in Ballerup take?
It depends on the size of the home and how much work is needed. A single room can often be finished in a few weeks, while a full house renovation usually takes longer. With one contractor planning every stage, there are fewer gaps between trades, which shortens the total time.
Is turnkey contracting more expensive than hiring trades separately?
Not necessarily. Separate trades may look cheaper on paper, but gaps, mistakes between jobs and delays often add hidden costs. A turnkey contract gives one fixed quote for the agreed scope, which makes the total cost easier to predict.
Can I live in my house during the renovation?
Often yes, depending on which rooms are being renovated. A coordinated schedule helps keep part of the home usable and reduces the time you spend living around construction work.
Why should floors be laid near the end of a renovation?
Laying floors after plumbing, electrical and wall work protects the new surface from damage caused by tools, heavy equipment, paint and building materials.
What should be checked before new floors are installed?
The subfloor should be checked for stability, levelness and moisture. Door thresholds and skirting boards should also be planned so the finished floor fits neatly.




